| PIPELINE WORK | |||||||
| No. | Project Name | Scope Of Work | Client | Owner | Value Of Contract (Rp.) |
Value Of Contract (Rp.) |
Period |
| 1. | Pipeline & Steam dia 36″ Work | Fabrication and Installation | PT. Rekayasa Industri | Magma Nusantara Limited | 22 Mei 1999 – 17 April 2000 | ||
| 2. | Pipeline dari Point B ke PT PIM – 2 | Engineering, Procurement & Construction | PT Titis Sampurna | PT Pertamina | Januari 2004 – Agustus 2004 | ||
| 3. | Construction of Gas Fuel Line Bentayan | Procurement, Construction | Conocophillips | Conocophillips | 210.000 | January 2005 – February 2005 | |
| 4. | Jumper Line – Bajubang Pipeline Exit | Procurement, Construction | Conocophillips | Conocophillips | 161.000 | January 2005 – February 2005 | |
| 5. | Installation of 6″ MP Gas Line Mutiara Southern Area Debottlenecking | Construction | VICO Indonesia | VICO Indonesia | 8.023.000.000 | Juli 2005 – Desember 2005 | |
| 6. | Tangguh LNG Piping Works | Mechanical , Piping Work | JGC Corporation – PT KBR Indonesia Joint Oparation | BP Berau | 18.500.000 | Mar 2005 – April 2008 | |
| 7. | Permanen Repair Submarine Pipeline (SPL) 36″ SPM 150.000 DWT | EPC | PT. Pertamina | PT. Pertamina | Sept 2006 – Sept 2007 | ||
| 8. | EPC For Greater Jakarta Distribution Mainline | EPC | PT Perusahaan Gas Negara | PT Perusahaan Gas Negara | 7.497.400.000 | 7.313.206.66 | Sept 2006 – Nov 2008 |
| 9. | Piping Works Package Area A | Construction | PT Rekayasa Industri | PT. Magma Nusantara Limited | 7.960.000.000 | April 2008 – Aug 2008 | |